Request a Quote » Contact a Power Quality Expert »
Distributor Login
February 16, 2018

3 Reasons You Should Upgrade Your PQube 3 Firmware (3.6.0)

1. Gain peace of mind with automatic EN 50160 compliance reports sent from your PQube 3 – no download, no software needed! You now receive an embedded graphical EN 50160 summary (GIF format), daily or weekly, with no configuration needed.   Click here for an EN 50160 Sample Report 2. Perform better equipment failure diagnostics with the new detailed 2 kHz – 150 …

February 2, 2018

PSL at DistribuTECH 2018: Above & Beyond Power Quality

Last week the annual DistribuTECH conference was held in San Antonio, Texas.

January 4, 2018

PQube 3e Captures California Earthquake

On January 4, 2018 at 2:39 AM Berkeley, California was shaken by a 4.4 magnitude earthquake.

October 13, 2017

Recap of Power Standards Lab’s Channel Partner Symposium

This past September, we held our most collaborative and hands-on Symposium to date in Auckland, New Zealand.

September 19, 2017

Lessons Learned from the Eclipse and its Effect on Solar Power and the Distribution Grid

The August 21, 2017, eclipse presented a unique opportunity to study how Distributed Energy Resources (DER), such as solar PV, affect the electric distribution grid.

April 20, 2017

We’re pleased to announce Firmware 3.5.2!

Thanks to the feedback we received from you, and our end-users, we made a number of improvements to our firmware.

Power Standards Lab
980 Atlantic Ave.
Alameda, California 94501

contact@powerstandards.com
TEL: ++1.510.522.4400
US: 1.888.SEMI.F47 or 1.888.736.4347

Join Our Email List!

Lean on our power quality expertise, so you can focus on what you do best
  • This field is for validation purposes and should be left unchanged.

PSL is a company